Contors.png

AUCKLAND RAIL ELECTRIFICATION

Considered the foremost experts in rail surveying in New Zealand, Surveygroup were called on to provide 24/7 surveying expertise to ensure the Auckland electrification project remained in line and on track.

The project demanded considerable resources during its 2 year development with real time live monitoring and 12 x 12 hour shifts during construction peaks. 

OUR ROLE:

  • Pilons and Structures Grid Set Out

  • Station Grid Set Out

  • Structures Monitoring

  • Construction Monitoring

  • Digital Engineering

  • Digital Model Management

  • As Built Surveys

  • Live Environment Advisory